Metal Fabrication 5 Axis CNC Milling High Precision Stainless Steel/Aluminum/Titanium Machining Service

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Specifications

Model NO.
WM-278
Condition
New
Certification
CE, RoHS, GS, ISO9001
Standard
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Material
Aluminum/Stainless Steel/Titanium
Tolerance
+/-0.005mm or Special Requirements
Roughness
Ra0.2 - Ra3.2
Processing
CNC Machining, Turning, Milling, Die Casting
Quality Control
100% Full Inspection
OEM & ODM
Available
Capacity
100,000 PCS
Lead Time
14-21 days (Mass Production)
📦

Packaging & Delivery

Package Size
60.00cm * 60.00cm * 30.00cm
Gross Weight
20.000kg

Product Description

Our facility was established in 2005, with a plant area of over 5,000 square meters. We have passed GB/T19001-2016/ISO 9001:2015 quality system certification. Our factory is equipped with 28 sets of CNC lathes, 32 sets of CNC milling machines (including 4 sets of 3-axis, 14 sets of 3-axis, and 14 sets of 5-axis CNC equipment). We utilize a comprehensive product testing system including Coordinate Measuring Machines (CMM), 2.5D measuring machines, optical integrating balls, hardness testers, and high-low temperature chambers.

With a core team of over 70 people across R&D, professional engineering, production, and QC departments, we ensure the delivery of high-quality and satisfying products. We have experience serving global industry leaders in telecommunications, automotive, medical, and electronics sectors.
Metal MaterialTitanium, Aluminum, Stainless Steel, Copper/Brass, Iron, any types of alloy
Machine3 / 4 / 5 axis CNC Machining Center, CNC turning machine, Stamping machine
RoughnessRa0.2-Ra3.2
Tolerance0.005~0.05mm or refer to drawings strictly
Main ProcessTurning / Milling / stamping / bending / Die-casting
Surface FinishingSandblasting, Polishing, Anodize, Zinc, Nickel, Chrome, Plating, Heat treatment
ApplicationAutomation industry, Automobile industry, Medical device industry, Electronics, Home appliance, Aerospace industry, Oil & Gas exploration
Packing DetailsEPE foam/ Anti-Rust Paper/ Stretch Film/ Plastic bag + Carton
Delivery TimeMass production: 14-21 days
MATERIALS FOR CUSTOM CNC MACHINING PARTS
AluminiumAL1050, AL2024, A360, AL4643, AL5052, AL5083, AL6061, AL6063, AL6082, AL7075, AL7075-T6, A380, MIC6
Stainless steelSS303, SS303F, SS304, SS316, SS316L, SS440, SS420, SS430, SS630, 17-4PH
Brass/Copper/BronzeC11000, C10100, C1720, C21000, C27200, C3710, C51900, C5210, C6301
SteelsSAE1010, SAE1020, SAE1040, SAE1045, SAE4340, A366/CQ, A36, GR60, D-2, 12L14
TitaniumTA0 / TA1 / TA2 / TC4 / TB5, etc.
PlasticsPOM, PC, ABS, Nylon, G-10, PVC, PMMA, PP, HDPE, PEEK, PTFE, PET, TPU
FINISHES AND PART MARKING
AnodizingElectrochemical treatment for hardness, corrosion resistance, and glossiness. Suitable for Aluminum, Titanium.
PolishingAchieves a smooth and shiny surface. Suitable for various metals and plastics.
SandblastingRemoves dirt, oxide layers, and scratches. Suitable for various metals and plastics.
ElectroplatingDeposits metal coating to improve surface hardness. Suitable for various metals.
Powder CoatDurable and uniform coating via electrostatically charged powder. Suitable for Aluminum, Steel.
?

Frequently Asked Questions

Do you customize products according to design drawings?
Yes, we are a professional metal manufacturing factory with an experienced engineering team that creates customized products strictly according to customer drawings.
Will my design drawings be safe once you receive them?
Absolutely. We do not publish designs to third parties without your permission. We are happy to sign an NDA (Non-Disclosure Agreement) before you send any drawings.
What is your capacity for mass production?
We have independent large-scale production conditions with over 70 CNC machine tools and 40 injection molding machines, supported by our own dedicated mold workshop.
How do you handle surface treatment quality?
We utilize sample color identification and precise dispensing to ensure batch consistency. We also strengthen manual inspection to avoid any defective products.
How do you prevent quality problems in mass orders?
We implement strict prevention and inspection protocols throughout the production process. Key stages are set as quality control points with continuous follow-up and defense.
What is the typical lead time for production?
Sample lead time is generally 5-7 days, while mass production typically takes 14-21 days depending on complexity.

Related Products