Basic Information
Model NO.Customized
Molding TechnicsPressure Casting
ApplicationMachinery Parts
MaterialStainless Steel
Surface PreparationSand Blast
Surface RoughnessRa1.6
Machining Tolerance+/-0.10mm
StandardGB
CertificationCE, RoHS, ISO 9001:2000, ISO 9001:2008
Weight10g-100kg
Surface TreatmentBurring, Polishing, Shot Blasting, Sandblasting
TechnologyInvestment Casting, Lost Wax Casting, Die Casting
Production Capacity100,000 PCS Per Month
OriginChina
Product Description
Core Advantages
✓More than 15-year experience in casting and machining.
✓One-stop service: from mould design, casting, machining, surface to delivery.
✓Abundant technology force and professional after-sales service.
✓ISO9001, SGS, TS16949 certified.
✓Advanced inspection equipment: X-ray, salt spray, hardness testers, etc.
✓Rich experience in exporting to more than 30 countries.
| Product | Investment/Precision Casting Parts, Lost Wax Casting |
| Technology | Investment casting, silicon sol casting, Machining |
| Material | Stainless Steel, Carbon Steel |
| Surface Roughness | Ra1.6 to Ra6.3 |
| Surface Treatment | Polishing, Brushed, Plating, Powder Coating, Heat Treatment, etc. |
| Weight | 0.05kg~150kg |
| Lead Time | 30-35 days for order, 15-25 days for mould + samples |
| Capacity | 150 tons per Month |
| Application | Automobile, Motorcycle, Furniture, Engineering parts, Household appliance, Medical appliances, LED accessories, etc. |
Manufacture Process
01Review part design and quality standards.
02Mould and Tooling design & manufacturing.
03Tooling testing & sample confirmation.
04Die casting raw castings.
05Surface treatment (trimming, polishing, coating).
06Precision machining (CNC, milling, drilling).
07Full inspection.
08Packing and Delivery.
Quality Control
4 necessary inspections are required for each order to ensure steady quality:
●Raw material inspection
●Semi-finished product inspection
●Finished product inspection
●Random warehouse inspection
Packing & Delivery
Our normal packing is bag + carton + pallet or according to customers' requirements. Goods can be delivered by sea, by train, or by air according to needs.
Frequently Asked Questions
Q1: What is the MOQ?
A: MOQ depends on customers' needs; trial orders are also welcomed before mass-production.
Q2: How long is the mass production lead time?
A: It varies depending on product dimensions, technical requirements, and quantities. Lead time usually takes 25-35 days.
Q3: What should I do to get a quote?
A: Please send us 2D or 3D drawings (with material, dimension, tolerance, surface treatment, and other technical requirements), quantity, application, or samples. Price will be offered within 24h.
Q4: How can I track my order progress without visiting the factory?
A: A detailed production schedule and weekly reports with digital pictures and videos showing the machining progress will be sent to you.
Q5: How do we process the order?
A: After confirming the order, a Proforma invoice will be sent. Upon receiving the deposit, production is arranged immediately and finished in about 25-30 days based on quantity.
Q6: What payment terms do you accept?
A: We accept T/T, L/C, Paypal, Western Union, etc.