Manufacturing Process
1. Review part design, drawings, and quality standards with clients.
2. Professional Mould and Tooling design & manufacturing.
3. Tooling testing and sample confirmation.
4. Precision die casting of raw components.
5. Surface treatment: trimming, deburring, polishing, cleaning, and coating.
6. Precision machining: CNC lathes, milling, drilling, and grinding.
7. 100% Final inspection and quality verification.
Quality Control & Testing
To ensure steady quality, four critical inspections are performed for every order:
- Raw material inspection
- Semi-finished product inspection
- Finished product inspection
- Random warehouse inspection
Packing & Delivery
Standard export packing: Protective bag + reinforced carton + pallet, or customized based on requirements. Delivery is available via sea, air, or rail transport.
Frequently Asked Questions
Q1: What is the minimum order quantity (MOQ)?
A: The MOQ depends on specific customer needs; however, trial orders are welcomed prior to mass production.
Q2: What is the typical lead time for mass production?
A: Lead times vary based on product dimensions, technical complexity, and quantity. Generally, mass production takes 25-35 days.
Q3: What information is needed to receive a quote?
A: Please provide 2D or 3D drawings (including material, dimensions, tolerances, and surface treatments), total quantity, and application requirements.
Q4: How can I monitor my order progress?
A: We provide detailed production schedules and weekly reports, including digital photos and videos showing the machining progress.
Q5: What is the order process?
A: Upon order confirmation, a Proforma Invoice is issued for the deposit. Production begins immediately after receiving the deposit and takes approximately 25-30 days.
Q6: Which payment terms do you accept?
A: We accept T/T, L/C, PayPal, Western Union, and other standard payment methods.